Guide to Hot Weather Concreting: Chapter 5 Production and Delivery; Chapter 6 Placing and Curing
Availability
On-Demand
Expires 180 days after start
Cost
$0.00
Credit Offered
0.1 CEU Credit
1 PDH Credit
This module is based on chapters 5 and 6, excerpted from ACI 305R-10, “Guide to Hot Weather Concreting,” address production, delivery, placement, and curing of concrete under hot weather conditions. Planning, cooling methods, controlling fresh properties, and retempering issues faced during production and delivery are considered. Requirements for placing and curing of concrete in hot weather are the same as in standard weather conditions, the concrete product should be handled so that is does not segregate, is placed in its final position, layered to minimized cold joints, and finished and cured to permit full strength development. This document was developed by ACI Committee 305 and approved by the ACI Technical Activities Committee. Additionally, this Concrete International magazine article, “Curing Test Cylinders in Hot Weather,” discusses techniques for controlling temperature and moisture loss during curing.
1. Recognize the impact of the temperatures of the concrete mixture ingredients on the overall mixture.
2. Identify practical methods to reduce the concrete temperature during hot weather concreting.
3. Understand that the requirements for handling, placing, and curing concrete in hot weather are no different than in other weather.
4. Know that an approved curing method should be in place for at least seven days.
Read and study the materials included in this module. Then, complete and pass the corresponding 10-question quiz with a score of 80% or higher to receive a certificate for 0.1 CEU (1.0 PDH).
Continuing Education Credit: 0.1 CEU (1.0 PDH)
Approved by AIA and ICC
Access Period: 180 days